Sell land with planning permission in Tenby
If you own land with planning permission near Tenby, we can usually tell you quite quickly whether it suits us, and if it doesn't, we'll say why.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- No commission: we're the buyer
- Figures explained, so you can check them
- Independent advice encouraged
Selling land near Tenby?
We'll check the title and planning, then call you.
Tenby at a glance
Tenby lies in Dyfed, some 21 miles south-west of Carmarthen. Nearby, we also look at land around Pembroke Dock (10 miles), Milford Haven (14 miles) and Haverfordwest (14 miles).
| Town | Tenby |
|---|---|
| County | Dyfed |
| Country | Wales |
| Postcode district | SA70 |
| OS grid square | SN10 |
| Nearest towns we cover | Pembroke Dock (10 mi), Milford Haven (14 mi), Haverfordwest (14 mi) |
| Distance from Carmarthen | About 21 miles south-west |
| Planning system | Planning Policy Wales and Local Development Plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What we look for around Tenby
- Full or outline permission for one home or more
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Sites with a signed Section 106 agreement we can read
- Lapsed or lapsing permissions, which we can look at renewing
A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.
What affects the price
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Choosing how to sell
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Send us the address
A postcode, a plan or a what3words location is enough to start.
We do the homework
We read the title and planning record and check flood risk and access.
We put an offer in writing
It shows how we got there. There's no obligation to accept.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
What Wales's rules mean for your land
Planning framework
Planning in Wales follows Planning Policy Wales, the national plan Future Wales and the Local Development Plan, prepared by the council or, in a national park, the park authority. When plans are reviewed, landowners can put land forward as a candidate site.
Biodiversity
Wales doesn't use England's 10% net gain metric. Planning Policy Wales expects development to deliver a net benefit for biodiversity.
Agricultural buildings
England's Class Q rights don't apply in Wales. Converting a barn to a home in Wales generally needs planning permission.
When the land isn't straightforward
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- The address or postcode
- A plan, or a screenshot from an online map
- Your title number, if you know it
- How soon you'd ideally like to sell
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Can you visit land near Tenby?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
Land with planning permission near Tenby
Other land in Tenby
- Development land
- Land without planning permission
- Large strategic sites
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Tenby
- Land with planning permission in Dyfed
Ready to talk about your land in Tenby?
Call 0800 088 6248 or send the details. There's no obligation.