Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Rushden

Whether your land is in Rushden itself or in the villages between Rushden and Wellingborough, we'll look at it properly before making any offer.

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

  • No commission: we're the buyer
  • No pressure to decide
  • Independent advice encouraged

Selling land near Rushden?

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Land around Rushden

Rushden (NN10) sits in OS grid square SP96, some 12 miles east of Northampton. Sites between here and Wellingborough or Bedford are just as much of interest to us.

Rolling farmland and expanding towns such as Northampton, Corby and Kettering, with no designated green belt.

TownRushden
CountyNorthamptonshire
CountryEngland
Postcode districtNN10
OS grid squareSP96
Nearest towns we coverWellingborough (4 mi), Kettering (9 mi), Bedford (12 mi)
Distance from NorthamptonAbout 12 miles east
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

What makes land with planning permission near Rushden worth an offer

  • Full or outline permission for one home or more
  • Permissions that are still within their time limit, or have been lawfully started
  • Sites with a signed Section 106 agreement we can read
  • Lapsed or lapsing permissions, which we can look at renewing

If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.

The things that move our offer

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

What happens next

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

What England's rules mean for your land

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Awkward details we deal with

The conditions look onerous

Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • Any planning applications or letters
  • Photos of the land and its access
  • How soon you'd ideally like to sell

Your questions answered

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Can I sell a plot with prior approval for a barn conversion?

Yes. Prior approvals are time limited and have their own rules, so we check the approval and the building before making an offer.

How do I get an offer for land in Rushden?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Get a straight answer about your land

A free appraisal tells you what we'd pay and why.