Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Desborough

Whether your land is in Desborough itself or in the villages between Desborough and Market Harborough, we'll look at it properly before making any offer.

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

  • No commission: we're the buyer
  • Figures explained, so you can check them
  • No pressure to decide

Get an offer for land in Desborough

Free, no-obligation appraisal.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Desborough at a glance

Desborough (NN14) sits in OS grid square SP88, about 14 miles north of Northampton. Sites between here and Market Harborough or Corby are just as much of interest to us.

TownDesborough
CountyNorthamptonshire
CountryEngland
Postcode districtNN14
OS grid squareSP88
Nearest towns we coverMarket Harborough (5 mi), Kettering (5 mi), Corby (7 mi)
Distance from NorthamptonAbout 14 miles north
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Land we're keen to see around Desborough

  • Full or outline permission for one home or more
  • Reserved matters approvals or discharge-of-conditions decisions already in place
  • Permissions that are still within their time limit, or have been lawfully started
  • Plots with permission in principle

If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.

What decides the value of land with planning permission near Desborough

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

What happens next

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

What England's rules mean for your land

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Awkward details we deal with

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • A plan, or a screenshot from an online map
  • Your title number, if you know it
  • Details of any tenants or grazing agreements

Common questions

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

Do you cover the villages around Desborough?

Yes. Villages between Desborough, Market Harborough and Kettering often have the kind of edge-of-settlement land we're looking for.

Ready to talk about your land in Desborough?

A free appraisal tells you what we'd pay and why.