Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Kettering

Thinking about whether to sell land with planning permission in Kettering? A free appraisal tells you what we'd pay and how we got there, with no obligation to go further.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • Free appraisal and written offer
  • No commission: we're the buyer
  • No pressure to decide

Selling land near Kettering?

Free, no-obligation appraisal.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Land around Kettering

The land we're most interested in near Kettering sits on the edge of the built-up area or in the villages towards Desborough (5 miles) and Wellingborough (7 miles).

Rolling farmland and expanding towns such as Northampton, Corby and Kettering, with no designated green belt.

TownKettering
CountyNorthamptonshire
CountryEngland
Postcode districtNN16
OS grid squareSP87
Nearest towns we coverDesborough (5 mi), Wellingborough (7 mi), Corby (7 mi)
Distance from NorthamptonAbout 12 miles north-east
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Is your land near Kettering a good fit?

  • Full or outline permission for one home or more
  • Permissions that are still within their time limit, or have been lawfully started
  • Lapsed or lapsing permissions, which we can look at renewing
  • Plots with permission in principle

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

How we arrive at a figure for land in Northamptonshire

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

What happens next

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Awkward details we deal with

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The conditions look onerous

Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.

Useful to send us

  • Your title number, if you know it
  • Any planning applications or letters
  • Photos of the land and its access
  • How soon you'd ideally like to sell

Your questions answered

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

How do I get an offer for land in Kettering?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Ready to talk about your land in Kettering?

Call 0800 088 6248 or send the details. There's no obligation.