Sell land with planning permission in Kettering
Thinking about whether to sell land with planning permission in Kettering? A free appraisal tells you what we'd pay and how we got there, with no obligation to go further.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- No commission: we're the buyer
- No pressure to decide
Selling land near Kettering?
Free, no-obligation appraisal.
Land around Kettering
The land we're most interested in near Kettering sits on the edge of the built-up area or in the villages towards Desborough (5 miles) and Wellingborough (7 miles).
Rolling farmland and expanding towns such as Northampton, Corby and Kettering, with no designated green belt.
| Town | Kettering |
|---|---|
| County | Northamptonshire |
| Country | England |
| Postcode district | NN16 |
| OS grid square | SP87 |
| Nearest towns we cover | Desborough (5 mi), Wellingborough (7 mi), Corby (7 mi) |
| Distance from Northampton | About 12 miles north-east |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Is your land near Kettering a good fit?
- Full or outline permission for one home or more
- Permissions that are still within their time limit, or have been lawfully started
- Lapsed or lapsing permissions, which we can look at renewing
- Plots with permission in principle
A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.
How we arrive at a figure for land in Northamptonshire
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Choosing how to sell
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
The legal work
Your solicitor and ours handle the contract through to completion.
What England's rules mean for your land
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Awkward details we deal with
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
Useful to send us
- Your title number, if you know it
- Any planning applications or letters
- Photos of the land and its access
- How soon you'd ideally like to sell
Your questions answered
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
How do I get an offer for land in Kettering?
Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.
Land with planning permission near Kettering
Other land types and routes
- Development land
- Land without planning permission
- Large strategic sites
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Kettering
- Land with planning permission in Northamptonshire
Ready to talk about your land in Kettering?
Call 0800 088 6248 or send the details. There's no obligation.