Sell land with planning permission in Monmouth
We consider land with planning permission in Monmouth and across Gwent, from sites close to the NP25 postcode district out towards Ross-on-Wye and Chepstow.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- No pressure to decide
- Independent advice encouraged
Selling land near Monmouth?
Send the postcode and a rough size.
Monmouth at a glance
The land we're most interested in near Monmouth sits on the edge of the built-up area or in the villages towards Ross-on-Wye (10 miles) and Chepstow (12 miles).
South-east Wales, from the Valleys towns to Newport and the Wye Valley National Landscape in Monmouthshire.
| Town | Monmouth |
|---|---|
| County | Gwent |
| Country | Wales |
| Postcode district | NP25 |
| OS grid square | SO51 |
| Nearest towns we cover | Ross-on-Wye (10 mi), Chepstow (12 mi), Abergavenny (13 mi) |
| Distance from Newport | About 20 miles north-east |
| Planning system | Planning Policy Wales and Local Development Plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Land we're keen to see around Monmouth
- Full or outline permission for one home or more
- Permissions that are still within their time limit, or have been lawfully started
- Sites with a signed Section 106 agreement we can read
- Lapsed or lapsing permissions, which we can look at renewing
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
How we arrive at a figure for land in Gwent
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Choosing how to sell
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
How a sale works
Send us the address
A postcode, a plan or a what3words location is enough to start.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
The legal work
Your solicitor and ours handle the contract through to completion.
What Wales's rules mean for your land
Planning framework
Planning in Wales follows Planning Policy Wales, the national plan Future Wales and the Local Development Plan, prepared by the council or, in a national park, the park authority. When plans are reviewed, landowners can put land forward as a candidate site.
Agricultural buildings
England's Class Q rights don't apply in Wales. Converting a barn to a home in Wales generally needs planning permission.
Section 106 and CIL
Section 106 agreements apply in Wales, and a small number of Welsh councils charge the Community Infrastructure Levy.
When the land isn't straightforward
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
Useful to send us
- The address or postcode
- A rough size, in acres or hectares
- A plan, or a screenshot from an online map
- Photos of the land and its access
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Can you visit land near Monmouth?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
Also near Monmouth
Other land types and routes
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Monmouth
- Land with planning permission in Gwent
Ready to talk about your land in Monmouth?
Call 0800 088 6248 or send the details. There's no obligation.