Sell land with planning permission in Cwmbran
Whether your land is in Cwmbran itself or in the villages between Cwmbran and Pontypool, we'll look at it properly before making any offer.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Figures explained, so you can check them
- No pressure to decide
- Independent advice encouraged
Get an offer for land in Cwmbran
We'll check the title and planning, then call you.
Cwmbran at a glance
From Cwmbran, it's 3 miles to Pontypool and 5 miles to Risca. We buy land across that whole stretch of Gwent, not only within the town.
| Town | Cwmbran |
|---|---|
| County | Gwent |
| Country | Wales |
| Postcode district | NP44 |
| OS grid square | ST29 |
| Nearest towns we cover | Pontypool (3 mi), Risca (5 mi), Newport, Gwent (5 mi) |
| Distance from Newport | About 5 miles north |
| Planning system | Planning Policy Wales and Local Development Plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Land we're keen to see around Cwmbran
- Full or outline permission for one home or more
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Permissions that are still within their time limit, or have been lawfully started
- Lapsed or lapsing permissions, which we can look at renewing
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
What decides the value of land with planning permission near Cwmbran
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Ways to sell this land
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
From first call to completion
Send us the address
A postcode, a plan or a what3words location is enough to start.
We do the homework
We read the title and planning record and check flood risk and access.
You get a written offer
With the main figures behind it, so your adviser can check it.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
What Wales's rules mean for your land
Planning framework
Planning in Wales follows Planning Policy Wales, the national plan Future Wales and the Local Development Plan, prepared by the council or, in a national park, the park authority. When plans are reviewed, landowners can put land forward as a candidate site.
Agricultural buildings
England's Class Q rights don't apply in Wales. Converting a barn to a home in Wales generally needs planning permission.
Section 106 and CIL
Section 106 agreements apply in Wales, and a small number of Welsh councils charge the Community Infrastructure Levy.
Awkward details we deal with
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- The address or postcode
- A plan, or a screenshot from an online map
- Details of any tenants or grazing agreements
- Photos of the land and its access
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Can you visit land near Cwmbran?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
Land with planning permission near Cwmbran
Other land types and routes
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Cwmbran
- Land with planning permission in Gwent
Get a straight answer about your land
A free appraisal tells you what we'd pay and why.