Sell land with planning permission in Greenford
If you own land around Greenford and want a straight answer about it, we'll tell you whether we can buy it, on what terms, and what the offer is based on.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- Figures explained, so you can check them
- No pressure to decide
Get an offer for land in Greenford
Free, no-obligation appraisal.
Where Greenford sits
Greenford lies in Greater London, some 10 miles west of central London. Nearby, we also look at land around Northolt (1 mile), Southall (2 miles) and Wembley (3 miles).
| Town | Greenford |
|---|---|
| County | Greater London |
| Country | England |
| Postcode district | UB6 |
| OS grid square | TQ18 |
| Nearest towns we cover | Northolt (1 mi), Southall (2 mi), Wembley (3 mi) |
| Distance from central London | About 10 miles west |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What we look for around Greenford
- Permissions that are still within their time limit, or have been lawfully started
- Sites with a signed Section 106 agreement we can read
- Prior approvals for conversions, such as agricultural buildings to homes
- Lapsed or lapsing permissions, which we can look at renewing
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
What affects the price
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Choosing how to sell
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Tell us about your land
Send the postcode or address and a rough size.
We do the homework
We read the title and planning record and check flood risk and access.
You get a written offer
With the main figures behind it, so your adviser can check it.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
Rules that apply in England
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Awkward details we deal with
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
Useful to send us
- The address or postcode
- Any planning applications or letters
- Photos of the land and its access
- How soon you'd ideally like to sell
Questions from landowners near Greenford
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Do you cover the villages around Greenford?
Yes. Villages between Greenford, Northolt and Southall often have the kind of edge-of-settlement land we're looking for.
Other land types and routes
- Development land
- Land without planning permission
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Greenford
- Land with planning permission in Greater London
Get a straight answer about your land
Send the postcode and a rough size. We'll check the title and planning position and come back to you.