Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Southall

Our interest in land with planning permission around Southall is simple: we're buying land to build homes on, so we look for sites where homes are realistic and price them on that basis.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • Free appraisal and written offer
  • Figures explained, so you can check them
  • No pressure to decide

Tell us about your land

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Southall at a glance

The land we're most interested in near Southall sits on the edge of the built-up area or in the villages towards Greenford (2 miles) and Heston (2 miles).

Land is scarce and mostly brownfield. The outer boroughs contain Metropolitan Green Belt and metropolitan open land, both closely protected.

TownSouthall
CountyGreater London
CountryEngland
Postcode districtUB1
OS grid squareTQ18
Nearest towns we coverGreenford (2 mi), Heston (2 mi), Hayes (2 mi)
Distance from central LondonAbout 10 miles west
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Is your land near Southall a good fit?

  • Permissions that are still within their time limit, or have been lawfully started
  • Prior approvals for conversions, such as agricultural buildings to homes
  • Lapsed or lapsing permissions, which we can look at renewing
  • Plots with permission in principle

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

The things that move our offer

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Section 106 and CIL

Affordable housing and financial contributions come straight off what a buyer can pay.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

How a sale works

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. We put an offer in writing

    It shows how we got there. There's no obligation to accept.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

When the land isn't straightforward

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • A rough size, in acres or hectares
  • Your title number, if you know it
  • Details of any tenants or grazing agreements

Common questions

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Does a permission go with the land when I sell?

Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

Can you visit land near Southall?

Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.

Get a straight answer about your land

Call 0800 088 6248 or send the details. There's no obligation.