Sell land with planning permission in Westbury
For owners of land with planning permission in and around Westbury, we offer four ways to sell, from a clean outright purchase to deals that pay more once planning is granted.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- No commission: we're the buyer
- Figures explained, so you can check them
- Independent advice encouraged
Selling land near Westbury?
We'll check the title and planning, then call you.
Westbury at a glance
From Westbury, it's 4 miles to Warminster and 4 miles to Trowbridge. We buy land across that whole stretch of Wiltshire, not only within the town.
Salisbury Plain, the Cotswolds, North Wessex Downs and Cranborne Chase, with growth around Swindon, Chippenham, Trowbridge and Salisbury.
| Town | Westbury |
|---|---|
| County | Wiltshire |
| Country | England |
| Postcode district | BA13 |
| OS grid square | ST85 |
| Nearest towns we cover | Warminster (4 mi), Trowbridge (4 mi), Frome (6 mi) |
| Distance from Swindon | About 27 miles south-west |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What makes land with planning permission near Westbury worth an offer
- Full or outline permission for one home or more
- Permissions that are still within their time limit, or have been lawfully started
- Prior approvals for conversions, such as agricultural buildings to homes
- Lapsed or lapsing permissions, which we can look at renewing
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
How we arrive at a figure for land in Wiltshire
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Send us the address
A postcode, a plan or a what3words location is enough to start.
We check it properly
Title, planning history, access, flood maps and local policy.
We put an offer in writing
It shows how we got there. There's no obligation to accept.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
Rules that apply in England
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Common problems, and how we handle them
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- A rough size, in acres or hectares
- A plan, or a screenshot from an online map
- Any planning applications or letters
- How soon you'd ideally like to sell
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Do you buy land in Westbury?
Yes. We consider land in and around Westbury and across Wiltshire. Whether we can make an offer depends on the land itself, especially its access and planning prospects, and we'll tell you either way.
Land with planning permission near Westbury
Other land in Westbury
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Westbury
- Land with planning permission in Wiltshire
Ready to talk about your land in Westbury?
Send the postcode and a rough size. We'll check the title and planning position and come back to you.