Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Wakefield

Whether your land is in Wakefield itself or in the villages between Wakefield and Lofthouse, we'll look at it properly before making any offer.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • No commission: we're the buyer
  • Figures explained, so you can check them
  • Independent advice encouraged

Selling land near Wakefield?

We'll check the title and planning, then call you.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Where Wakefield sits

Wakefield (WF1) sits in OS grid square SE32, roughly 8 miles south of Leeds. Sites between here and Lofthouse or Dewsbury are just as much of interest to us.

TownWakefield
CountyWest Yorkshire
CountryEngland
Postcode districtWF1
OS grid squareSE32
Nearest towns we coverLofthouse (3 mi), Ossett (3 mi), Dewsbury (5 mi)
Distance from LeedsAbout 8 miles south
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

What we look for around Wakefield

  • Full or outline permission for one home or more
  • Reserved matters approvals or discharge-of-conditions decisions already in place
  • Sites with a signed Section 106 agreement we can read
  • Lapsed or lapsing permissions, which we can look at renewing

Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.

The things that move our offer

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

How a sale works

  1. Send us the address

    A postcode, a plan or a what3words location is enough to start.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. We put an offer in writing

    It shows how we got there. There's no obligation to accept.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

Rules that apply in England

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Awkward details we deal with

The conditions look onerous

Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • Your title number, if you know it
  • Any planning applications or letters
  • Photos of the land and its access
  • How soon you'd ideally like to sell

Common questions

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

Can I sell a plot with prior approval for a barn conversion?

Yes. Prior approvals are time limited and have their own rules, so we check the approval and the building before making an offer.

How do I get an offer for land in Wakefield?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Ready to talk about your land in Wakefield?

Call 0800 088 6248 or send the details. There's no obligation.