Sell land with planning permission in Ossett
Whether your land is in Ossett itself or in the villages between Ossett and Dewsbury, we'll look at it properly before making any offer.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Figures explained, so you can check them
- No pressure to decide
- Independent advice encouraged
Selling land near Ossett?
Free, no-obligation appraisal.
Ossett at a glance
The land we're most interested in near Ossett sits on the edge of the built-up area or in the villages towards Dewsbury (2 miles) and Batley (3 miles).
| Town | Ossett |
|---|---|
| County | West Yorkshire |
| Country | England |
| Postcode district | WF5 |
| OS grid square | SE22 |
| Nearest towns we cover | Dewsbury (2 mi), Batley (3 mi), Wakefield (3 mi) |
| Distance from Leeds | About 8 miles south |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Land we're keen to see around Ossett
- Permissions that are still within their time limit, or have been lawfully started
- Prior approvals for conversions, such as agricultural buildings to homes
- Lapsed or lapsing permissions, which we can look at renewing
- Plots with permission in principle
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
The things that move our offer
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Section 106 and CIL
Affordable housing and financial contributions come straight off what a buyer can pay.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
How a sale works
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
The legal work
Your solicitor and ours handle the contract through to completion.
What England's rules mean for your land
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Awkward details we deal with
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- A rough size, in acres or hectares
- A plan, or a screenshot from an online map
- Any planning applications or letters
- Details of any tenants or grazing agreements
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Does a permission go with the land when I sell?
Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Can you visit land near Ossett?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
More land we buy in Ossett
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Ossett
- Land with planning permission in West Yorkshire
Ready to talk about your land in Ossett?
Call 0800 088 6248 or send the details. There's no obligation.