Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Royal Leamington Spa

Our interest in land with planning permission around Royal Leamington Spa is simple: we're buying land to build homes on, so we look for sites where homes are realistic and price them on that basis.

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

  • Free appraisal and written offer
  • No pressure to decide
  • Independent advice encouraged

Selling land near Royal Leamington Spa?

We'll check the title and planning, then call you.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Where Royal Leamington Spa sits

Royal Leamington Spa (CV32) sits in OS grid square SP36, some 17 miles south of Nuneaton. Sites between here and Warwick or Coventry are just as much of interest to us.

Farmland and historic towns, with the West Midlands green belt across much of the north and west of the county.

TownRoyal Leamington Spa
CountyWarwickshire
CountryEngland
Postcode districtCV32
OS grid squareSP36
Nearest towns we coverWarwick (3 mi), Kenilworth (5 mi), Coventry (8 mi)
Distance from NuneatonAbout 17 miles south
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Land we're keen to see around Royal Leamington Spa

  • Full or outline permission for one home or more
  • Reserved matters approvals or discharge-of-conditions decisions already in place
  • Permissions that are still within their time limit, or have been lawfully started
  • Lapsed or lapsing permissions, which we can look at renewing

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

What decides the value of land with planning permission near Royal Leamington Spa

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

What happens next

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

When the land isn't straightforward

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • A rough size, in acres or hectares
  • A plan, or a screenshot from an online map
  • Any planning applications or letters

Your questions answered

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Does a permission go with the land when I sell?

Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

Can you visit land near Royal Leamington Spa?

Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.

Find out what we'd pay for your land near Royal Leamington Spa

Send the postcode and a rough size. We'll check the title and planning position and come back to you.