Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Ewell

Whether your land is in Ewell itself or in the villages between Ewell and Epsom, we'll look at it properly before making any offer.

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

  • Free appraisal and written offer
  • Figures explained, so you can check them
  • No pressure to decide

Tell us about your land

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Ewell at a glance

Our appraisals for Ewell start with the KT17 postcode district and the OS grid square TQ26, then widen out to Epsom, Sutton and Banstead, all within about 3 miles.

Most of the county is Metropolitan Green Belt, and the Surrey Hills National Landscape covers much of the rest.

TownEwell
CountySurrey
CountryEngland
Postcode districtKT17
OS grid squareTQ26
Nearest towns we coverEpsom (2 mi), Sutton (2 mi), Banstead (3 mi)
Distance from WokingAbout 14 miles east
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

What we look for around Ewell

  • Full or outline permission for one home or more
  • Reserved matters approvals or discharge-of-conditions decisions already in place
  • Prior approvals for conversions, such as agricultural buildings to homes
  • Lapsed or lapsing permissions, which we can look at renewing

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

The things that move our offer

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

From first call to completion

  1. Send us the address

    A postcode, a plan or a what3words location is enough to start.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

When the land isn't straightforward

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • Your title number, if you know it
  • Any planning applications or letters
  • Details of any tenants or grazing agreements
  • Photos of the land and its access

Your questions answered

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

How do I get an offer for land in Ewell?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Ready to talk about your land in Ewell?

A free appraisal tells you what we'd pay and why.