Sell land with planning permission in Walkden
Thinking about whether to sell land with planning permission in Walkden? A free appraisal tells you what we'd pay and how we got there, with no obligation to go further.
If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.
- Free appraisal and written offer
- Figures explained, so you can check them
- Independent advice encouraged
Get an offer for land in Walkden
Send the postcode and a rough size.
Land around Walkden
Walkden (M28) sits in OS grid square SD70, some 7 miles west of Manchester. Sites between here and Farnworth or Tyldesley are just as much of interest to us.
A dense urban core where most new homes are on brownfield land, with green belt on the edges climbing towards the Pennines.
| Town | Walkden |
|---|---|
| County | Greater Manchester |
| Country | England |
| Postcode district | M28 |
| OS grid square | SD70 |
| Nearest towns we cover | Farnworth (2 mi), Swinton (2 mi), Tyldesley (3 mi) |
| Distance from Manchester | About 7 miles west |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Is your land near Walkden a good fit?
- Full or outline permission for one home or more
- Sites with a signed Section 106 agreement we can read
- Lapsed or lapsing permissions, which we can look at renewing
- Plots with permission in principle
A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.
What decides the value of land with planning permission near Walkden
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Tell us about your land
Send the postcode or address and a rough size.
We do the homework
We read the title and planning record and check flood risk and access.
You get a written offer
With the main figures behind it, so your adviser can check it.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
What England's rules mean for your land
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Common problems, and how we handle them
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- The address or postcode
- A plan, or a screenshot from an online map
- Any planning applications or letters
- How soon you'd ideally like to sell
Your questions answered
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Can you visit land near Walkden?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
More land we buy in Walkden
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Walkden
- Land with planning permission in Greater Manchester
Get a straight answer about your land
Call 0800 088 6248 or send the details. There's no obligation.