Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Radcliffe

For owners of land with planning permission in and around Radcliffe, we offer four ways to sell, from a clean outright purchase to deals that pay more once planning is granted.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • No commission: we're the buyer
  • Figures explained, so you can check them
  • Independent advice encouraged

Get an offer for land in Radcliffe

Free, no-obligation appraisal.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Radcliffe at a glance

The land we're most interested in near Radcliffe sits on the edge of the built-up area or in the villages towards Whitefield (1 mile) and Prestwich (3 miles).

A dense urban core where most new homes are on brownfield land, with green belt on the edges climbing towards the Pennines.

TownRadcliffe
CountyGreater Manchester
CountryEngland
Postcode districtM26
OS grid squareSD70
Nearest towns we coverWhitefield (1 mi), Prestwich (3 mi), Bury (3 mi)
Distance from ManchesterAbout 7 miles north-west
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Is your land near Radcliffe a good fit?

  • Sites with a signed Section 106 agreement we can read
  • Prior approvals for conversions, such as agricultural buildings to homes
  • Lapsed or lapsing permissions, which we can look at renewing
  • Plots with permission in principle

If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.

What affects the price

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

How a sale works

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Common problems, and how we handle them

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • Your title number, if you know it
  • Photos of the land and its access
  • How soon you'd ideally like to sell

Questions from landowners near Radcliffe

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

How do I get an offer for land in Radcliffe?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Ready to talk about your land in Radcliffe?

Send the postcode and a rough size. We'll check the title and planning position and come back to you.