Sell land with planning permission in Uxbridge
If you own land with planning permission near Uxbridge, we can usually tell you quite quickly whether it suits us, and if it doesn't, we'll say why.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- No commission: we're the buyer
- Figures explained, so you can check them
Get an offer for land in Uxbridge
Send the postcode and a rough size.
Where Uxbridge sits
The land we're most interested in near Uxbridge sits on the edge of the built-up area or in the villages towards Ruislip (3 miles) and Hayes (3 miles).
Land is scarce and mostly brownfield. The outer boroughs contain Metropolitan Green Belt and metropolitan open land, both closely protected.
| Town | Uxbridge |
|---|---|
| County | Greater London |
| Country | England |
| Postcode district | UB8 |
| OS grid square | TQ08 |
| Nearest towns we cover | Ruislip (3 mi), Hayes (3 mi), Gerrards Cross (4 mi) |
| Distance from central London | About 15 miles west |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Land we're keen to see around Uxbridge
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Permissions that are still within their time limit, or have been lawfully started
- Sites with a signed Section 106 agreement we can read
- Prior approvals for conversions, such as agricultural buildings to homes
If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.
The things that move our offer
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Section 106 and CIL
Affordable housing and financial contributions come straight off what a buyer can pay.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
From first call to completion
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
Planning and legal points for land in Greater London
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
When the land isn't straightforward
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
Useful to send us
- A plan, or a screenshot from an online map
- Any planning applications or letters
- Details of any tenants or grazing agreements
- How soon you'd ideally like to sell
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Can you visit land near Uxbridge?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
More land we buy in Uxbridge
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Uxbridge
- Land with planning permission in Greater London
Ready to talk about your land in Uxbridge?
Call 0800 088 6248 or send the details. There's no obligation.