Sell land with planning permission in Islington
We consider land with planning permission in Islington and across Greater London, from sites close to the EC1P postcode district out towards Highbury and Holloway.
If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.
- Free appraisal and written offer
- Figures explained, so you can check them
- Independent advice encouraged
Get an offer for land in Islington
We'll check the title and planning, then call you.
Land around Islington
Islington (EC1P) sits in OS grid square TQ38, roughly 2 miles north-east of central London. Sites between here and Highbury or Camden Town are just as much of interest to us.
Land is scarce and mostly brownfield. The outer boroughs contain Metropolitan Green Belt and metropolitan open land, both closely protected.
| Town | Islington |
|---|---|
| County | Greater London |
| Country | England |
| Postcode district | EC1P |
| OS grid square | TQ38 |
| Nearest towns we cover | Highbury (1 mi), Holloway (1 mi), Camden Town (2 mi) |
| Distance from central London | About 2 miles north-east |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What we look for around Islington
- Full or outline permission for one home or more
- Prior approvals for conversions, such as agricultural buildings to homes
- Lapsed or lapsing permissions, which we can look at renewing
- Plots with permission in principle
A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.
What decides the value of land with planning permission near Islington
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Ways to sell this land
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Send us the address
A postcode, a plan or a what3words location is enough to start.
We check it properly
Title, planning history, access, flood maps and local policy.
We put an offer in writing
It shows how we got there. There's no obligation to accept.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
What England's rules mean for your land
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Common problems, and how we handle them
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- The address or postcode
- A rough size, in acres or hectares
- A plan, or a screenshot from an online map
- Details of any tenants or grazing agreements
Common questions
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Do you cover the villages around Islington?
Yes. Villages between Islington, Highbury and Holloway often have the kind of edge-of-settlement land we're looking for.
Land with planning permission near Islington
Other land types and routes
- Development land
- Land without planning permission
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Islington
- Land with planning permission in Greater London
Ready to talk about your land in Islington?
A free appraisal tells you what we'd pay and why.