Sell land with planning permission in Archway
We consider land with planning permission in Archway and across Greater London, from sites close to the N19 postcode district out towards Holloway and Muswell Hill.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- No commission: we're the buyer
- Figures explained, so you can check them
- No pressure to decide
Selling land near Archway?
We'll check the title and planning, then call you.
Where Archway sits
Archway (N19) sits in OS grid square TQ28, about 4 miles north of central London. Sites between here and Holloway or Chalk Farm are just as much of interest to us.
| Town | Archway |
|---|---|
| County | Greater London |
| Country | England |
| Postcode district | N19 |
| OS grid square | TQ28 |
| Nearest towns we cover | Holloway (1 mi), Muswell Hill (2 mi), Chalk Farm (2 mi) |
| Distance from central London | About 4 miles north |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What makes land with planning permission near Archway worth an offer
- Full or outline permission for one home or more
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Sites with a signed Section 106 agreement we can read
- Lapsed or lapsing permissions, which we can look at renewing
A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.
The things that move our offer
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
How a sale works
Send us the address
A postcode, a plan or a what3words location is enough to start.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
The legal work
Your solicitor and ours handle the contract through to completion.
Rules that apply in England
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Awkward details we deal with
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- The address or postcode
- Your title number, if you know it
- Any planning applications or letters
- Details of any tenants or grazing agreements
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Does a permission go with the land when I sell?
Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you visit land near Archway?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
Land with planning permission near Archway
Other land types and routes
- Development land
- Land without planning permission
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Archway
- Land with planning permission in Greater London
Get a straight answer about your land
Send the postcode and a rough size. We'll check the title and planning position and come back to you.