Sell land with planning permission in Pitsea
Whether your land is in Pitsea itself or in the villages between Pitsea and Basildon, we'll look at it properly before making any offer.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- No commission: we're the buyer
- Figures explained, so you can check them
- No pressure to decide
Get an offer for land in Pitsea
Send the postcode and a rough size.
Pitsea at a glance
Land around Pitsea falls under England's planning system. The closest towns we also cover are Basildon, 2 miles away, and South Benfleet, 2 miles away, and Southend-on-Sea is 9 miles away.
Metropolitan Green Belt covers the south and west of the county, while mid and north Essex have larger areas of farmland around growing towns.
| Town | Pitsea |
|---|---|
| County | Essex |
| Country | England |
| Postcode district | SS13 |
| OS grid square | TQ78 |
| Nearest towns we cover | Basildon (2 mi), South Benfleet (2 mi), Wickford (3 mi) |
| Distance from Southend-on-Sea | About 9 miles west |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Is your land near Pitsea a good fit?
- Full or outline permission for one home or more
- Permissions that are still within their time limit, or have been lawfully started
- Sites with a signed Section 106 agreement we can read
- Lapsed or lapsing permissions, which we can look at renewing
If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.
The things that move our offer
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Section 106 and CIL
Affordable housing and financial contributions come straight off what a buyer can pay.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Ways to sell this land
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
From first call to completion
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
Rules that apply in England
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Common problems, and how we handle them
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- A plan, or a screenshot from an online map
- Your title number, if you know it
- Any planning applications or letters
- Details of any tenants or grazing agreements
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Can you visit land near Pitsea?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
Also near Pitsea
Other land types and routes
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Pitsea
- Land with planning permission in Essex
Get a straight answer about your land
Send the postcode and a rough size. We'll check the title and planning position and come back to you.