Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Pitsea

Whether your land is in Pitsea itself or in the villages between Pitsea and Basildon, we'll look at it properly before making any offer.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • No commission: we're the buyer
  • Figures explained, so you can check them
  • No pressure to decide

Get an offer for land in Pitsea

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Pitsea at a glance

Land around Pitsea falls under England's planning system. The closest towns we also cover are Basildon, 2 miles away, and South Benfleet, 2 miles away, and Southend-on-Sea is 9 miles away.

Metropolitan Green Belt covers the south and west of the county, while mid and north Essex have larger areas of farmland around growing towns.

TownPitsea
CountyEssex
CountryEngland
Postcode districtSS13
OS grid squareTQ78
Nearest towns we coverBasildon (2 mi), South Benfleet (2 mi), Wickford (3 mi)
Distance from Southend-on-SeaAbout 9 miles west
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Is your land near Pitsea a good fit?

  • Full or outline permission for one home or more
  • Permissions that are still within their time limit, or have been lawfully started
  • Sites with a signed Section 106 agreement we can read
  • Lapsed or lapsing permissions, which we can look at renewing

If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.

The things that move our offer

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Section 106 and CIL

Affordable housing and financial contributions come straight off what a buyer can pay.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

From first call to completion

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

Rules that apply in England

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Common problems, and how we handle them

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • A plan, or a screenshot from an online map
  • Your title number, if you know it
  • Any planning applications or letters
  • Details of any tenants or grazing agreements

What people ask us about land with planning permission

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

Can you visit land near Pitsea?

Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.

Get a straight answer about your land

Send the postcode and a rough size. We'll check the title and planning position and come back to you.