Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Lower Earley

We buy land with planning permission across Berkshire. In Lower Earley, as everywhere, the offer depends on the land itself: its access, its planning prospects and what can sensibly be built.

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

  • Figures explained, so you can check them
  • No pressure to decide
  • Independent advice encouraged

Get an offer for land in Lower Earley

We'll check the title and planning, then call you.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Land around Lower Earley

Lower Earley lies in Berkshire, roughly 3 miles south-east of Reading. Nearby, we also look at land around Reading (3 miles), Wokingham (4 miles) and Crowthorne (7 miles).

The Thames valley towns are under steady pressure for new homes. Much of east Berkshire is Metropolitan Green Belt, and the west takes in part of the North Wessex Downs National Landscape.

TownLower Earley
CountyBerkshire
CountryEngland
Postcode districtRG6
OS grid squareSU77
Nearest towns we coverReading (3 mi), Wokingham (4 mi), Crowthorne (7 mi)
Distance from ReadingAbout 3 miles south-east
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Is your land near Lower Earley a good fit?

  • Sites with a signed Section 106 agreement we can read
  • Prior approvals for conversions, such as agricultural buildings to homes
  • Lapsed or lapsing permissions, which we can look at renewing
  • Plots with permission in principle

Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.

The things that move our offer

Section 106 and CIL

Affordable housing and financial contributions come straight off what a buyer can pay.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

From first call to completion

  1. Send us the address

    A postcode, a plan or a what3words location is enough to start.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Common problems, and how we handle them

The conditions look onerous

Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • A rough size, in acres or hectares
  • A plan, or a screenshot from an online map
  • Photos of the land and its access

Common questions

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

Can you visit land near Lower Earley?

Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.

Get a straight answer about your land

Send the postcode and a rough size. We'll check the title and planning position and come back to you.