Sell land with planning permission in Nailsea
Thinking about whether to sell land with planning permission in Nailsea? A free appraisal tells you what we'd pay and how we got there, with no obligation to go further.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- No pressure to decide
- Independent advice encouraged
Selling land near Nailsea?
Free, no-obligation appraisal.
Where Nailsea sits
From Nailsea, it's 3 miles to Portishead and 4 miles to Clevedon. We buy land across that whole stretch of Somerset, not only within the town.
The Levels and Moors, where flooding and nutrient rules are major planning issues, plus Exmoor, the Mendip Hills, and green belt around Bath.
| Town | Nailsea |
|---|---|
| County | Somerset |
| Country | England |
| Postcode district | BS48 |
| OS grid square | ST47 |
| Nearest towns we cover | Portishead (3 mi), Clevedon (4 mi), Bishopsworth (6 mi) |
| Distance from Bath | About 18 miles west |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Land we're keen to see around Nailsea
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Permissions that are still within their time limit, or have been lawfully started
- Lapsed or lapsing permissions, which we can look at renewing
- Plots with permission in principle
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
How we arrive at a figure for land in Somerset
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
From first call to completion
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
We put an offer in writing
It shows how we got there. There's no obligation to accept.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
What England's rules mean for your land
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
When the land isn't straightforward
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- A rough size, in acres or hectares
- A plan, or a screenshot from an online map
- Your title number, if you know it
- Any planning applications or letters
Questions from landowners near Nailsea
Does a permission go with the land when I sell?
Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
How do I get an offer for land in Nailsea?
Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.
Also near Nailsea
More land we buy in Nailsea
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Nailsea
- Land with planning permission in Somerset
Get a straight answer about your land
A free appraisal tells you what we'd pay and why.