Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Shrewsbury

If you own land around Shrewsbury and want a straight answer about it, we'll tell you whether we can buy it, on what terms, and what the offer is based on.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • No commission: we're the buyer
  • Figures explained, so you can check them
  • No pressure to decide

Selling land near Shrewsbury?

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Shrewsbury at a glance

Shrewsbury (SY1) sits in OS grid square SJ41, about 13 miles west of Telford. Sites between here and Wellington or Oswestry are just as much of interest to us.

A rural county with the Shropshire Hills National Landscape, green belt in the east near the West Midlands, and growth around Shrewsbury and Telford.

TownShrewsbury
CountyShropshire
CountryEngland
Postcode districtSY1
OS grid squareSJ41
Nearest towns we coverWellington (10 mi), Telford (13 mi), Oswestry (16 mi)
Distance from TelfordAbout 13 miles west
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Is your land near Shrewsbury a good fit?

  • Full or outline permission for one home or more
  • Permissions that are still within their time limit, or have been lawfully started
  • Sites with a signed Section 106 agreement we can read
  • Lapsed or lapsing permissions, which we can look at renewing

If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.

What affects the price

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

How a sale works

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. We put an offer in writing

    It shows how we got there. There's no obligation to accept.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

Planning and legal points for land in Shropshire

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Common problems, and how we handle them

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • A rough size, in acres or hectares
  • Your title number, if you know it
  • How soon you'd ideally like to sell

What people ask us about land with planning permission

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Do you pay more for full permission?

Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.

How do I get an offer for land in Shrewsbury?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Ready to talk about your land in Shrewsbury?

Call 0800 088 6248 or send the details. There's no obligation.