Sell land with planning permission in Brecon
If you own land with planning permission near Brecon, we can usually tell you quite quickly whether it suits us, and if it doesn't, we'll say why.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- Figures explained, so you can check them
- No pressure to decide
Selling land near Brecon?
We'll check the title and planning, then call you.
Where Brecon sits
The land we're most interested in near Brecon sits on the edge of the built-up area or in the villages towards Merthyr Tydfil (14 miles) and Ebbw Vale (14 miles).
A large rural county including much of Bannau Brycheiniog National Park, with small market towns spread across it.
| Town | Brecon |
|---|---|
| County | Powys |
| Country | Wales |
| Postcode district | LD3 |
| OS grid square | SO02 |
| Nearest towns we cover | Merthyr Tydfil (14 mi), Ebbw Vale (14 mi), Aberdare (16 mi) |
| Distance from Newtown | About 40 miles south |
| Planning system | Planning Policy Wales and Local Development Plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

Land we're keen to see around Brecon
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Permissions that are still within their time limit, or have been lawfully started
- Sites with a signed Section 106 agreement we can read
- Lapsed or lapsing permissions, which we can look at renewing
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
What affects the price
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Abnormal costs
Retaining walls, drainage works or contamination add cost beyond a normal build.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
What happens next
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
You get a written offer
With the main figures behind it, so your adviser can check it.
The legal work
Your solicitor and ours handle the contract through to completion.
Rules that apply in Wales
Planning framework
Planning in Wales follows Planning Policy Wales, the national plan Future Wales and the Local Development Plan, prepared by the council or, in a national park, the park authority. When plans are reviewed, landowners can put land forward as a candidate site.
Agricultural buildings
England's Class Q rights don't apply in Wales. Converting a barn to a home in Wales generally needs planning permission.
Section 106 and CIL
Section 106 agreements apply in Wales, and a small number of Welsh councils charge the Community Infrastructure Levy.
Awkward details we deal with
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- A plan, or a screenshot from an online map
- Your title number, if you know it
- Any planning applications or letters
- How soon you'd ideally like to sell
Common questions
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Do you pay more for full permission?
Usually, because there is less risk and less work before building can start. How much more depends on the conditions and obligations attached.
Can you visit land near Brecon?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
Also near Brecon
Other land types and routes
- Development land
- Land without planning permission
- Large strategic sites
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Brecon
- Land with planning permission in Powys
Find out what we'd pay for your land near Brecon
Send the postcode and a rough size. We'll check the title and planning position and come back to you.