Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Leigh

We buy land with planning permission across Greater Manchester. In Leigh, as everywhere, the offer depends on the land itself: its access, its planning prospects and what can sensibly be built.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • Free appraisal and written offer
  • No pressure to decide
  • Independent advice encouraged

Tell us about your land

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Leigh at a glance

Leigh (WN7) sits in OS grid square SD60, about 12 miles west of Manchester. Sites between here and Atherton or Golborne are just as much of interest to us.

A dense urban core where most new homes are on brownfield land, with green belt on the edges climbing towards the Pennines.

TownLeigh
CountyGreater Manchester
CountryEngland
Postcode districtWN7
OS grid squareSD60
Nearest towns we coverAtherton (2 mi), Tyldesley (2 mi), Golborne (3 mi)
Distance from ManchesterAbout 12 miles west
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

What makes land with planning permission near Leigh worth an offer

  • Full or outline permission for one home or more
  • Reserved matters approvals or discharge-of-conditions decisions already in place
  • Sites with a signed Section 106 agreement we can read
  • Plots with permission in principle

If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.

What affects the price

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Section 106 and CIL

Affordable housing and financial contributions come straight off what a buyer can pay.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

How a sale works

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. Solicitors complete the sale

    Exchange and complete, or exchange now and complete when planning is granted.

What England's rules mean for your land

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Common problems, and how we handle them

The permission is about to expire

In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • A rough size, in acres or hectares
  • A plan, or a screenshot from an online map
  • Any planning applications or letters
  • Details of any tenants or grazing agreements

Questions from landowners near Leigh

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Does a permission go with the land when I sell?

Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

Can you visit land near Leigh?

Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.

Find out what we'd pay for your land near Leigh

Call 0800 088 6248 or send the details. There's no obligation.