Sell land with planning permission in Catford
If you own land around Catford and want a straight answer about it, we'll tell you whether we can buy it, on what terms, and what the offer is based on.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- No commission: we're the buyer
- Figures explained, so you can check them
- No pressure to decide
Selling land near Catford?
Free, no-obligation appraisal.
Catford at a glance
Catford (SE6) sits in OS grid square TQ37, some 6 miles south-east of central London. Sites between here and Blackheath or Beckenham are just as much of interest to us.
Land is scarce and mostly brownfield. The outer boroughs contain Metropolitan Green Belt and metropolitan open land, both closely protected.
| Town | Catford |
|---|---|
| County | Greater London |
| Country | England |
| Postcode district | SE6 |
| OS grid square | TQ37 |
| Nearest towns we cover | Blackheath (2 mi), Greenwich (2 mi), Beckenham (3 mi) |
| Distance from central London | About 6 miles south-east |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What makes land with planning permission near Catford worth an offer
- Reserved matters approvals or discharge-of-conditions decisions already in place
- Sites with a signed Section 106 agreement we can read
- Prior approvals for conversions, such as agricultural buildings to homes
- Lapsed or lapsing permissions, which we can look at renewing
If you already hold consent, you have done the hard part. We review the decision notice, conditions and any legal agreement, then make an offer that reflects what it will really cost to build.
What affects the price
Time left on the permission
A permission close to expiry may need a quick start or a fresh application, and that affects price.
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Section 106 and CIL
Affordable housing and financial contributions come straight off what a buyer can pay.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Four routes to a sale
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
How a sale works
Send us the address
A postcode, a plan or a what3words location is enough to start.
We check it properly
Title, planning history, access, flood maps and local policy.
We put an offer in writing
It shows how we got there. There's no obligation to accept.
Solicitors complete the sale
Exchange and complete, or exchange now and complete when planning is granted.
What England's rules mean for your land
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Agricultural buildings (Class Q)
In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Common problems, and how we handle them
The permission is about to expire
In England a full permission normally lasts three years and in Wales five. We check whether a lawful start has been made or whether a new application is the better route.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- A plan, or a screenshot from an online map
- Your title number, if you know it
- Any planning applications or letters
- How soon you'd ideally like to sell
What people ask us about land with planning permission
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Can you visit land near Catford?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
More land we buy in Catford
- Development land
- Land without planning permission
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Catford
- Land with planning permission in Greater London
Find out what we'd pay for your land near Catford
Send the postcode and a rough size. We'll check the title and planning position and come back to you.