Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Dursley

If you own land with planning permission near Dursley, we can usually tell you quite quickly whether it suits us, and if it doesn't, we'll say why.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • Figures explained, so you can check them
  • No pressure to decide
  • Independent advice encouraged

Selling land near Dursley?

Send the postcode and a rough size.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Dursley at a glance

Dursley lies in Gloucestershire, about 14 miles south of Gloucester. Nearby, we also look at land around Stroud (8 miles), Yate (10 miles) and Gloucester (14 miles).

TownDursley
CountyGloucestershire
CountryEngland
Postcode districtGL11
OS grid squareST79
Nearest towns we coverStroud (8 mi), Yate (10 mi), Gloucester (14 mi)
Distance from GloucesterAbout 14 miles south
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

Land we're keen to see around Dursley

  • Permissions that are still within their time limit, or have been lawfully started
  • Prior approvals for conversions, such as agricultural buildings to homes
  • Lapsed or lapsing permissions, which we can look at renewing
  • Plots with permission in principle

A site with a live planning permission is the simplest land to sell. The main questions are whether the permission is still valid, what its conditions require and how much the Section 106 agreement costs to deliver.

What affects the price

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Time left on the permission

A permission close to expiry may need a quick start or a fresh application, and that affects price.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Abnormal costs

Retaining walls, drainage works or contamination add cost beyond a normal build.

How a sale works

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We do the homework

    We read the title and planning record and check flood risk and access.

  3. You get a written offer

    With the main figures behind it, so your adviser can check it.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

Rules that apply in England

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Agricultural buildings (Class Q)

In England, Class Q permitted development can allow some agricultural buildings to become homes through prior approval, within limits on size and number of homes.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Common problems, and how we handle them

The conditions look onerous

Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • Any planning applications or letters
  • Photos of the land and its access
  • How soon you'd ideally like to sell

Your questions answered

Does a permission go with the land when I sell?

Yes. Planning permission attaches to the land, not to the owner, so it passes to the buyer automatically.

Can I sell a plot with prior approval for a barn conversion?

Yes. Prior approvals are time limited and have their own rules, so we check the approval and the building before making an offer.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

How do I get an offer for land in Dursley?

Use the form on this page or call 0800 088 6248. Tell us the postcode, the rough size and anything you know about planning, and we'll come back to you.

Get a straight answer about your land

Call 0800 088 6248 or send the details. There's no obligation.