Sell land with planning permission in Peterborough
If you own land with planning permission near Peterborough, we can usually tell you quite quickly whether it suits us, and if it doesn't, we'll say why.
Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.
- Free appraisal and written offer
- No commission: we're the buyer
- Independent advice encouraged
Get an offer for land in Peterborough
Free, no-obligation appraisal.
Land around Peterborough
The land we're most interested in near Peterborough sits on the edge of the built-up area or in the villages towards Whittlesey (5 miles) and Primrose Place (6 miles).
| Town | Peterborough |
|---|---|
| County | Cambridgeshire |
| Country | England |
| Postcode district | PE1 |
| OS grid square | TL19 |
| Nearest towns we cover | Whittlesey (5 mi), Primrose Place (6 mi), Stamford (11 mi) |
| Planning system | National Planning Policy Framework and local plan |
| Ways to sell | Outright, subject to planning, option or joint venture |

What we look for around Peterborough
- Full or outline permission for one home or more
- Permissions that are still within their time limit, or have been lawfully started
- Prior approvals for conversions, such as agricultural buildings to homes
- Lapsed or lapsing permissions, which we can look at renewing
Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.
How we arrive at a figure for land in Cambridgeshire
Type of permission
Full permission carries less risk than outline, which still needs reserved matters approval.
Pre-commencement conditions
Conditions that must be discharged before building starts can add surveys, cost and delay.
Scheme quality
A scheme that is hard to build or sell may need redesigning, which reduces the land value.
Sale values nearby
What similar new homes sell for locally sets the ceiling on value.
Ways to sell this land
Outright purchase
The usual route for consented land: agree a price, then exchange and complete.
Subject-to-planning sale
Useful if you want us to improve or renew the permission before completion.
Option agreements
Rarely needed once consent exists, but can suit phased sites.
Joint ventures
An option if you would like a share of the profit from building the homes.
From first call to completion
Tell us about your land
Send the postcode or address and a rough size.
We check it properly
Title, planning history, access, flood maps and local policy.
We put an offer in writing
It shows how we got there. There's no obligation to accept.
The legal work
Your solicitor and ours handle the contract through to completion.
Planning and legal points for land in Cambridgeshire
Planning framework
Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.
Biodiversity net gain
Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.
Section 106 and CIL
Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.
Common problems, and how we handle them
The conditions look onerous
Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.
The Section 106 makes the scheme unviable
If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.
Useful to send us
- The address or postcode
- A rough size, in acres or hectares
- Your title number, if you know it
- Any planning applications or letters
Your questions answered
How long does planning permission last?
In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.
Can you buy if I only have outline permission?
Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.
Can you exchange quickly on a consented site?
Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.
Can you visit land near Peterborough?
Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.
More land we buy in Peterborough
- Development land
- Land without planning permission
- Large strategic sites
- Green belt and grey belt land
- Land for affordable homes
- Farmland and agricultural land
- Paddocks and equestrian land
- Barns and rural buildings
- Building plots
- Garden land and backland
- Infill plots and gap sites
- Small sites
- Garage sites
- Brownfield land
- Redundant commercial and industrial land
- Inherited and probate land
- Landlocked land and access problems
- Outright purchase
- Subject-to-planning sale
- Option agreements
- Joint ventures
- All land in Peterborough
- Land with planning permission in Cambridgeshire
Ready to talk about your land in Peterborough?
A free appraisal tells you what we'd pay and why.