Land we buyWays to sellAreasGuidesAbout Contact Get an offer

Sell land with planning permission in Peterborough

If you own land with planning permission near Peterborough, we can usually tell you quite quickly whether it suits us, and if it doesn't, we'll say why.

Land with planning permission has consent from the local planning authority to build a specific development, either in outline (the principle) or in full (the detailed design). We buy consented sites directly, check the permission and its conditions, and make an offer you can accept without marketing the land.

  • Free appraisal and written offer
  • No commission: we're the buyer
  • Independent advice encouraged

Get an offer for land in Peterborough

Free, no-obligation appraisal.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email address.
Please enter a postcode, or at least the first half.
Please tick the box so we can contact you.

Free and no obligation. We're the buyer, so there's no commission.

Land around Peterborough

The land we're most interested in near Peterborough sits on the edge of the built-up area or in the villages towards Whittlesey (5 miles) and Primrose Place (6 miles).

TownPeterborough
CountyCambridgeshire
CountryEngland
Postcode districtPE1
OS grid squareTL19
Nearest towns we coverWhittlesey (5 mi), Primrose Place (6 mi), Stamford (11 mi)
Planning systemNational Planning Policy Framework and local plan
Ways to sellOutright, subject to planning, option or joint venture
Greenfield site with timber setting-out pegs and orange tape beside a temporary mesh fence

What we look for around Peterborough

  • Full or outline permission for one home or more
  • Permissions that are still within their time limit, or have been lawfully started
  • Prior approvals for conversions, such as agricultural buildings to homes
  • Lapsed or lapsing permissions, which we can look at renewing

Consented land sells on detail. We read every condition and obligation so our offer is based on the scheme as approved, not on guesswork.

How we arrive at a figure for land in Cambridgeshire

Type of permission

Full permission carries less risk than outline, which still needs reserved matters approval.

Pre-commencement conditions

Conditions that must be discharged before building starts can add surveys, cost and delay.

Scheme quality

A scheme that is hard to build or sell may need redesigning, which reduces the land value.

Sale values nearby

What similar new homes sell for locally sets the ceiling on value.

From first call to completion

  1. Tell us about your land

    Send the postcode or address and a rough size.

  2. We check it properly

    Title, planning history, access, flood maps and local policy.

  3. We put an offer in writing

    It shows how we got there. There's no obligation to accept.

  4. The legal work

    Your solicitor and ours handle the contract through to completion.

Planning and legal points for land in Cambridgeshire

Planning framework

Planning decisions in England follow the National Planning Policy Framework, revised in August 2026, and the local plan, prepared by the council or, in a national park, the park authority. Plans are reviewed periodically, which is when new housing sites are usually allocated.

Biodiversity net gain

Under the Environment Act 2021, most developments in England must deliver at least a 10% gain in biodiversity. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected.

Section 106 and CIL

Larger schemes often need a Section 106 agreement for affordable housing or contributions, and councils that have adopted the Community Infrastructure Levy charge it per square metre of new floorspace.

Common problems, and how we handle them

The conditions look onerous

Some conditions are routine and some are expensive. We price each one so you can see what is driving the offer.

The Section 106 makes the scheme unviable

If costs have moved since consent, a viability review or a variation may be possible. We will tell you if we think that is realistic.

Useful to send us

  • The address or postcode
  • A rough size, in acres or hectares
  • Your title number, if you know it
  • Any planning applications or letters

Your questions answered

How long does planning permission last?

In England, full planning permission usually requires work to start within three years, and in Wales within five, unless the decision notice says otherwise. Outline permissions have separate time limits for reserved matters. The decision notice sets out the exact dates.

Can you buy if I only have outline permission?

Yes. We will price the reserved matters work and the risk that the detailed design changes the number or type of homes.

Can you exchange quickly on a consented site?

Often, yes, because the planning question is answered. The pace then depends on title, searches and how quickly both solicitors work.

Can you visit land near Peterborough?

Yes. Once we've looked at the title and planning position, we arrange a site visit if the land looks suitable. Send the address or postcode to start.

Ready to talk about your land in Peterborough?

A free appraisal tells you what we'd pay and why.